We put in a door and a window into a 14 foot diameter grain bin. They were both recycled. A whopping $5  dollars between the both of them.
  | 
|  We took metal studs (recycled from a temporary wall from a jobsite)  and furred out the exterior walls and added a loft for sleeping. | 
  | 
| We added the electrical. The biggest cost.  | 
  | 
| This is a picture of the framing of the ceiling after adding the closed cell spray insulation.   We added about 2-3  inches of insulation giving it an R value of about 18.  We didn't have any cost in the insulation as it was left over from a job and was some spray experience for a new spray tech (my brother and Scott) | 
  | 
| Insulated the concrete slab and put down sub-floor. The subfloor material was stuff that I had stored for a couple of years.  Leftovers from other projects.   We nailed a 5/4 treated board to the concrete and put styrofoam in between them. The put 3/4" plywood over the top. | 
 