We put in a door and a window into a 14 foot diameter grain bin. They were both recycled. A whopping $5 dollars between the both of them.
|
We took metal studs (recycled from a temporary wall from a jobsite) and furred out the exterior walls and added a loft for sleeping. |
|
We added the electrical. The biggest cost. |
|
This is a picture of the framing of the ceiling after adding the closed cell spray insulation. We added about 2-3 inches of insulation giving it an R value of about 18. We didn't have any cost in the insulation as it was left over from a job and was some spray experience for a new spray tech (my brother and Scott) |
|
Insulated the concrete slab and put down sub-floor. The subfloor material was stuff that I had stored for a couple of years. Leftovers from other projects. We nailed a 5/4 treated board to the concrete and put styrofoam in between them. The put 3/4" plywood over the top. |