After leveling the ground some we started the process of building forms for the concrete that will sit on top of the buried tires. To make the stakes for the forms, my brother-in-law Cale, came up with the idea of using leftover pieces of conduit that were cut by electricians on one of the jobsites Chris was working on. The leftover 2 feet of conduit are usually thrown away. There were enough to make most of the concrete stakes. We ended up having to buy a couple of sticks of conduit from the hardware store and that cost around $30. The pieces were cut into 2 foot pieces, two holes were drilled into the conduit to be able to attach them with screws to the boards that make up the forms, and the bottom was cut at an angle to be able to hammer it into the ground easier. |