We put down the 3 inches of foam board and then started putting down the rebar.

The rebar is on 12 inch centers and tied at each crossing.

We added rebar sticking out of the grain bin and tied it to the rebar inside because we wanted it all tied together when the next portion of concrete is poured.

Then we started putting in all of the radiant tubing.

Tar was added around the grain bin where concrete would be touching it. The tar will prevent the concrete from making the bin deteriorate too quickly.

The final picture of the radiant tubing. Now we just have to wait until it is dry enough to pour concrete!!!