Tuesday, September 24, 2013

Finally the concrete is done!

Thankfully, we are blessed with a few good friends who are willing to pitch in and help along with Chris' brothers and dad. The concrete started coming at 7 am and 4 trucks later we were done. It still took all day to finish it with a power trowel but we are so very thankful it is done!!

This time we rented a power screet and it made the job much easier. It was a well spent $60 rental. As well as $60 for the power trowel.



The back half of the floor.

Finishing up pouring the front half.

Ta-da! The front of the house.

The back of the house. We figured it all out and after the gravel ,rebar, radient floor tubing and concrete 2400 square foot of concrete floor cost us less than $3 a square foot. 

1 comment:

  1. Noel, it's beautiful!!! I love seeing the progress you all are making!!!

    Are you trying to get in by winter? What's the plan?
    Rondi
    PS. The font size is a little hard to read.

    ReplyDelete