Monday, May 26, 2014

Finished up the roof and framing upstairs.

 This weekend was a bit longer than most. Two days worth of weekend for Chris to work on the house. He was able to get all of the back roof on. Thankfully, there will be no more shop vacuuming water out of the house! Chris started the framing of the outside of the upstairs and cutting the windows in. He was able to finish most of the framing, the ceiling and the loft area above the bathroom are what is left for this grain bin.



There is a window at the top of the stairs.

These are the windows in the front of the house. There is one in each of the bedrooms with a wall that splits them.

There is another window in the North bedroom. We were not able to put more than one in the South half of this grain bin because of the roof line. We are looking into skylights to put in the circle that are already in the roof.
The window at the top of the stairs.

The window in the North bedroom.
The front view. The other  grain bin will have the same windows in the front.
We did have to break down and buy a window, for the top of the stairs, from a store. It cost us $100...which is now the most expensive window in the house.