Tuesday, September 15, 2015

More Finishes...

The upstairs is now painted and the lights are hung. We have to refinish the hardwood upstairs and trim it all out. The master bedroom/bathroom is the only area left to finish the drywall in.

This is the loft area in between the girls' bedrooms. The wall on the opposite side is also the same shade of purple.

This room is a light grey in color and is a few shades lighter than the tin in the shared bathroom.


This room is a shade off of the shared bathroom green color.


It is really girly in here!
The wall lights in that room. They will be trimmed out with wood too.

The green color in the shared upstairs bathroom.
The tile is done and grouted. The light is hung. Now you can see the purple wall on this side of the area.
The light going up the stairs. The walls going up are the same grey as the kitchen underneath. Only one wall is painted purple.
Chris' brother Cale came up with this idea for the countertop in the main bath.
We had to order more bottlecaps. 300 wasn't enough. We will attach them and then build an edge to be able to pour resin over the top of them.





The kitchen is coming together too. The countertops are set and the backsplash is almost done.




Hannah's idea was to use some of the tin as the spacers in between the cabinets.


We cleaned up the floor on this half of the house now.

1 comment: