| There is a window at the top of the stairs. |
| These are the windows in the front of the house. There is one in each of the bedrooms with a wall that splits them. |
| The window at the top of the stairs. |
| The window in the North bedroom. |
| There is a window at the top of the stairs. |
| These are the windows in the front of the house. There is one in each of the bedrooms with a wall that splits them. |
| The window at the top of the stairs. |
| The window in the North bedroom. |
| Before grout |
| After grout. I don't see a whole lot of difference. |
| Upstairs on the far side of what will be the hall looking toward the stairs. |
| Abi's room facing the closet door because it is tough to take pictures in a circular room. |
| Hannah's door way is not up yet but this is her room. Between the two bedrooms will be their shared bathroom. |
| The front with grouted stone. We are closer to paint now but Chris is also closer to his job deadline at work and only getting busier!!!! That means less time for our house. |
| Close up of the foam-1x material- and the Ondura roofing. |
| Chris working all on his own. I do not do well on heights. |
| Chris got quite a bit done...about 1/3. |
| Oh and we got pigs a week ago! |
| The front with the stone completed. |
| A closer picture. |
| We got the siding up on the front of the house this week. |
| I was able to get all of the scratch coat on the lath below the siding so that Chris could start on the stone this weekend. |
| Chris started putting up the stone. We got this stone off of Craigslist for free three years ago. We have moved it twice now so, it is about time we get to use it on something! |
| Chris was able to get most of one side done but with all the rain we had to stop. |
| This is how the windows looked at the start of the day. |
| This is the first half of the windows trimmed out.( Of course, the dogs were in the way. They love the porch) |
| Close up view. |
| Another view of the framing for the ceiling of the porch. |
| We got a little bit of the siding up but it was starting to get dark. |
| It is hard to see much at this point. |
| Angus just thinks the whole process takes too long :) |
| These are the stairs for the second grain bin. It leads to the master bedroom and bath. |
| We started the upstairs flooring. |
| The view going down the stairs. |
| The biggest stack looks like this. It is in 8 foot long sheets. |
| The stack. |
| These are 4 foot tall decorative pieces. There are 8 of them. |
| These are another bigger stack of decorative pieces that are about 2 foot square. |
| There is a large stack of these crown molding pieces. |
| Another Trim piece style. There are about 12 pieces of it. |
| Another style of trim. |
| Another style of crown molding. |
| Chris finishing up the structure of the porch. |
| Putting on the cedar decking that we bought at an auction a while back. I think we paid $300 for a pallet of it. ( 64- 12 foot long pieces) |
| We ran out of boards. So we will have to go and buy the rest from a lumber yard. At almost $20 a board and we need 14 more....so it will cost almost as much as the rest of the deck cost. |