Tuesday, December 3, 2013

It's been awhile...

Things are moving a bit slower around here. The weather is not cooperating on the weekends and then with the holiday activity we are struggling to get much accomplished.
This morning I went out and started working on the final side of the back siding. The area to the left of the 2x4 will be another room that is built on the outside of the house. It will house the wood boiler and water storage tank to heat the radiant floor. There will be some kind of fireproofing between the house and the wood stove.

Here is a view of the rafters for the roof that we have been working on. I have taken a few pictures because it is hard to explain, but, there will basically be two sets of rafters. The ones for the ceilings of the rooms and then the rafters for the roof. We had to do this to create one continuous roof with the correct grade to it for the roofing product. 

From the back you can see one the right side we have the wood nailing strips attached to the grain bin for the rafters and the roof.

Just another view of the rafters for the roof and ceiling. As you can see, Chris started using up what we had left that would work. The I beams will make the roof stronger than we should ever need but we had them already so we just used them.

How we attached it to the grain bin.

Another view of the ones that are finished next to the ones that are not.

From the inside it seems like a ton of wood for what it is.This has been a really time consuming process because Chris is doing most of the work on his own. I help as much as I can but my knowledge is much more limited. At least I keep him from having to climb up and down too much by being able to cut things and get the other tools he needs.

Wednesday, November 20, 2013

Siding and a partial roof....


 We went ahead and worked on the siding on the back side of the house this weekend. We put in most of the windows in the downstairs and the back door. It was way too windy to work on the roof much this weekend and it is supposed to be really cold next weekend so I am not sure how much we will get done then either.

 The siding we got at an auction for $100 a pallet and we bought two pallets of it. It is a hardy board cement siding in a shake shingle style. The back door that we put on we ended up having to just go to the store and buy. That was hard for us to do but we hadn't found one that worked out for us before now. So it set us back $300.....way more than the siding for the house!

 This is a picture of the front with the windows in and the wood that will be under the siding. On the front we will be putting decorative rock under the windows and then the shake shingle siding above that.  The decorative rock Hunter and I picked up off of craigslist for free. We got two pickup truck loads of it!

Most of the front roof is on anyway!

Monday, November 11, 2013

supports and the start of a roof

We spent this weekend working on the rest of the rafters on the front of the house. After we were able to get the rafters up we moved on to putting in all the support pieces, the bridging in between the rafters.And then the nailer strips for the roofing material.



Chris decided that the best way to do the roof was to put on the nailer strips over the porch and then on the roof over the house to put down foam first and then the nailer strips. Once the roof is up the plan is to spray foam insulation on the underneath side of the roof as well as the exterior walls. By putting the foam insulation on the underneath side(against the foam boards) we will be able to replace the roof if need be at some point.  All of the nailer strips and other wood we used this weekend we already had purchased before.


The foam from the inside of the living room area looking up. We bought enough foam for all of the roof for $200. $10 a 21 foot sheet from someone on Craigslist who was taking down chicken houses from big farms. We had bought the foam for under the concrete from the same place.

Chris putting the last of the foam pieces on the roof.

The first row of roofing got put on before the weather turned cold and it started raining. At least it is dry under the porch. The roofing we bought is a brand called Ondura. It is a corrugated asphalt roofing that Chris has used before. We got it from Lowes for $5 a sheet,because a builder had order a bunch of it and never picked it up and Lowes wanted to get rid of it. The cost of material for the whole roof was around $1000. We did have to buy the Ondura brand nails and ridge vent for the roofing warranty, which meant we spent another $200. 

Monday, October 28, 2013

Porch posts and finishing the framing of the exterior walls

For the front porch, Chris wanted to make it rustic, so he cut down an Osage Orange (Hedge) tree from his brother's house and he is using the limbs for the posts. We are not sure how much more of the rustic wood we will end up adding to the porch. Chris made a gazebo out of hedge one time before and used the wood branches for the railing too. Hedge has been used for many,many years as fence posts. It is a very hard wood,very abundant in this area, and seems to last forever. A bonus is that is has very interesting turns and twists when it grows.



We dug holes in the ground three foot deep and set the posts in them


We braced off the posts so that we could pour cement in the holes to secure them. They were braced against the rafters to ensure that they were the same length from the house. Basically, you had to go for the top and bottom being in level and the middle kind of did whatever it needed to do. 


There is a beam that was set across the top of all of the posts so that the rafters for the porch had an even surface to set on.
We spent much of the weekend cutting the rafters and setting some of them on the front porch. The way that the roof will go, requires us to start at the porch front and work our way back so it has to be done too before a roof can go on.

This picture shows the line of the roof and more of the build.

We also finished all of the exterior walls this weekend and put in most of the windows in the downstairs area. Then we started setting the ceiling joists in the back portion of the house.

A view from the South side.

Wednesday, October 23, 2013

Pallet walls


The idea for the pallets walls,of course, came from the internet. The building in the left top corner of the first picture was our trail run with building walls from free pallets. It has been standing for over a year now, so I guess we did it right! The trick that was learned from the first try was that the pallets needed to be as close to the same size as possible. That made the whole process so much easier. It is not easy. It is probably easier to frame the walls with studs....but pallets are free ( or mostly free anyway)


This first group of pallets we did end up paying $2  pallet for. They came from a neighbor and were fairly uniform in size. They were large enough to make 6 inch exterior walls, which we really wanted at least on the North size of the house. 

The process is fairly straight forward, line up the pallets, put a nailer board in between and on the sides.


The white board is what we used to nail them together.

Then of course came standing them up and bracing with 2x4's while we are still building. Chris did end up putting a treated piece of wood on the concrete to attach to the concrete. He did not want there to be an issue with moisture getting into the wood that is against the concrete. He then drilled into the concrete and screwed the whole thing down.

The first section of the wall.

The window that will go into the wall just had to be framed the traditional way. We were able to make the length work out with the placement of the window to get four sections of pallets on the end. The other end will not have a window so we may have to fill in with traditional framing if Chris can not make the layout work for five sections of pallets.

The back section of the house. These pallets we were able to find for free. There is a larger window that helped us equal out the spacing of pallets. On the end of the run that is currently up there will e a back door. Alas, we ran out of pallets that were the same size so we are currently waiting on more. The ceiling joists are starting to go up in the mean time.

Friday, October 18, 2013

Framing curves

Chris bought sheet of 1/2 inch plywood and cut them in strips to make a beam to attach rafters to. We had to get the pieces to line up with the other rafters at the top of the beam we were making. It took a bit of figuring to get it right. There is not only a bend in the board but a slight curve because you are going down on the curve at an angle. The only way it worked out was to cut the pieces shorter to make sure the top edge lined up correctly.

This is what it looked like when it was done.

Just wanted to show the bigger picture of where the beam is. The rafters for the roof will sit on top of it. It is getting darker earlier so we are not seeming to get as much done in the evenings. Weekends are really the only time we get to work on it and then we have to adjust for rain.

Tuesday, October 8, 2013

more definition

This is the view from the back of the house. Chris was able to get the front wall framed and I was able to cut the rafters during the week this last week. Chris doesn't have too much time to work on the house at night now because it is getting dark so early and he is getting home so late. Weekends seem to be the only time we can get anything done and then we seem to only get one day in at best.

We laid out the track for the interior wall on the back side of the living room. The walls there will be 10 foot tall.


This is the brace that Hunter welded together one night. It runs the length of the living room and holds up the rafters for the roof. It took a lot of finesse to get the beam into place so high up with only Chris and Hunter( who is 17) doing the heavy lifting. The beam we got in a pile of material at an auction for $50.

Chris framing the back wall of the living room.





In this picture( although hard to see) it shows the front 6 windows. Three on each side of the door which also has sidelights to it.

The back framed wall with rafters. We have to do the rest of the exterior framing and the framing for the porch before any more of the rafters can go up.The rafters we also purchased at a building material auction. They cost $100 for 60 of them and they were 10. The pile of pallets will be what we use to frame the rest of the exterior walls, more on that when we get to it though.

Monday, September 30, 2013

A whole lot of nothing...

As far as taking pictures of stuff, there is a whole lot of nothing to take pictures of. The weather has not cooperated on the weekends( it rained all day Saturday). So, we spent the day at a building material auction, again, and had to pick some of it up Sunday because of the rain. We were able to get several light fixtures,2x4s, locks and door handles,interior doors, and some ceiling joists. There were other things here and there but we only spent $1000, and had two 16 foot trailer loads plus two trucks loaded down twice. We are really hoping the weather will be better this weekend and we can get more done.

Tuesday, September 24, 2013

Finally the concrete is done!

Thankfully, we are blessed with a few good friends who are willing to pitch in and help along with Chris' brothers and dad. The concrete started coming at 7 am and 4 trucks later we were done. It still took all day to finish it with a power trowel but we are so very thankful it is done!!

This time we rented a power screet and it made the job much easier. It was a well spent $60 rental. As well as $60 for the power trowel.



The back half of the floor.

Finishing up pouring the front half.

Ta-da! The front of the house.

The back of the house. We figured it all out and after the gravel ,rebar, radient floor tubing and concrete 2400 square foot of concrete floor cost us less than $3 a square foot.